Documentation

Pressure Vessels

(1.Before Manufacturing)
ITEM No. DESCRIPTION ACCORDING TO
1,1 DWG, Design, Calculation Document ASME Sec. VIII or EN 13445
1,2 Welding Map with WPS ASME
1,3 WPS & PQR ASME IX,EN 15608, EN 15614-1-1
1,4 Welder Qualification Certificates ASME IX, EN ISO 14732
1,5 NDE Personnel Certificates ASME V, EN 473, EN 9712
1,6 Hydro Static Test Procedure ASME Sec. VIII or EN 13445
1,7 Painting Procedure EMP Spec.
(2.Materials)
ITEM No. DESCRIPTION ACCORDING TO
2,1 Material Certificates EN 10204 3.1.
2,2 Welding Filler Materials ASME IX
(3. During Manufacturing)
ITEM No. DESCRIPTION ACCORDING TO
3,1 Head Forming and Dimension Check DWG, ASME Sec. VIII or EN 13445
3,2 Check of Rolling of Shell DWG, ASME Sec. VIII or EN 13445
3,3 Marking,Opening Nozzles and Nozzle Orientation DWG
3,4 Fit‐Up, Welding of pipe to flange WPS/DWG
3,5 PT,MT,RT and UT ASME/NDT Map/NDT Procedure
3,6 Visual & Dimensional Check DWG
3,7 Hydrostatic Test ASME VIII, EN 13445
3,8 Surface Fınısh and Painting Check EMP Spec.
(4. Final Inspection)
ITEM No. DESCRIPTION ACCORDING TO
4,1 Final Check of Documentation P.O. and Specifications
4,2 Ex-Works Release EMP Spec.
(5.Shipping)
ITEM No. DESCRIPTION ACCORDING TO
5,1 Marking Control & Release Note EMP Spec.
5,2 Loading Inspection EMP Spec.
5,3 Shipping Release EMP Spec.

 

Heat Exchangers

(1. Before Manufacturing)
ITEM No. DESCRIPTION ACCORDING TO
1,1 Approval By Customer
Drawing, Calculations, Inspection Plan, Fabrication and Test Procedures
Customer Specification
1,2 Approval By 3rd Party
Drawing, Calculations, Inspection Plan, Welding Specification
ASME VIII Div.1, Customer Spec.
1,3 Receiving Examination
Receiving Examination of Purchased Parts (Especially Tubes, Tube Sheets etc.)
UG 11
Drawing
1,4 Welding Map with WPS ASME Section IX
1,5 WPS & PQR ASME Section IX
1,6 Welder Qualification Certificates ASME Section IX
1,7 NDE Personnel Certificates ASME Section V
1,8 Material Traceability
transfer stamping of loose part to fill out the list of material certificates
ASME VIII Div.1
UG-93, UG-77
1,9 Check of Transfer Stamping and Material Certificates
check of the ready loose and store parts acc. to the material list and certificates
UG-93, UG-10
1,10 Material Certificates EN 10204 3.1.
1,11 Pre Inspection Meeting
Before Start of Manufacturing
(2. During Manufacturing)
ITEM No. DESCRIPTION ACCORDING TO
2,1 Welding Supervision
Check of the Tacked Welds Seams Preparation, Welding Workmanship, Filler Metals and Qualified Thickness, Welder Stamps, Welding Material Specification During Fabrication and Welds Surface Quality
ASME VIII Div.1, UG-97, UW-31, UW-32, Welding Spec.
2,2 Shell Assembling and Welding
Check of the Gap and Alignment Offset of Longitidunal and Circumferential Welded Butt Joints Before Weld, Check the Roundness and Height of Welding Seam
ASME VIII Div.1, UW-33, UW-35
Drawing
2,3 Testing of Shell
The Welds on Shell Side Shall Be 100% MT or PT Tested and
all the Butt Welds Shall Be 100% RT Tested.
ASME VIII Div.1, UW-11, ASME VIII Div.1, UG-97, UW-33,35
UW-50
Drawing
NDE Procedure
2,4 Shell Side Heat Treatment after Welds
Visual Check the Situation of the Shell
DRAWING
2,5 Main Dimensional Check of Shell
Main Dimensional Check of the Vessel.To Marking the Vessel Axis on Top Left and Right Side As Soon as Nozzle Axis. Check Nozzle Situation. Welds Ditribution and Apperance, Base Material Surface Quality.
DRAWING
2,6 Chamber Assembling and Welding
Open the Chamber Shell, Welding the Nozzles and Flanges, Welding the Floating Head
Customer Specification
Drawing
2,7 Testing of Channel
Check weld surface quality of channel and floating head. Making NDT Examination to welding joint according codes
ASME VIII Div.1, UG-103, ASME V Art. 6
DRAWING
NDE Procedure
2,8 Dimensional Inspection Before Assembling Tube Bundle
Before start of assembling the tube bundle, dimensioanl inspection of tube-sheet holes, tubes
DRAWING
TEMA
2,9 Assembling Tube Bundle DRAWING
2,10 Welding Tube to Tubesheet DRAWING
Welding Doc.
2,11 Expanding Tube to Tubesheet DRAWING
2,12 Tube to Tubesheet Joint Examination
100%NDE Examination
ASME VIII Div.1, UG-103, ASME V Art. 6
DRAWING
NDE Procedure
2,13 Joint Heat Treatment after Weld
2,14 Reinforcement Pad Leak Test
Visual Check of all Welds of Leaks and Possible Deformations
DRAWING
2,15 Hydrostatic Test of Vessel
Visual Check of surface quality and dimension. Pressure test according to the drawing. Request according to the drawing.
ASME VIII Div.1, UG-99,
DRAWING
2,16 Hydrostatic Test of Tube Side
Visual Check of surface quality and dimension. Pressure test according to the drawing. Request according to the drawing.
ASME VIII Div.1, UG-99,
DRAWING
2,17 Surface Treatment Vessel
Application of Paint Works outside of the vessel. Check of the surface treatment and measurement of the piant dry layer thickness.
DRAWING
PAINTING SPEC.
(3. Final Inspection)
ITEM No. DESCRIPTION ACCORDING TO
3,1 Final Inspection
Conforming with Drawing
Main Dimension
Nameplate
Final Documentation (PED/2014/68/EU)
Finish Workmanship
ASME VIII Div.1, UG-119, UG-120,
Purchase Order
Drawing
3,2 Ex-Works Release EMP Spec.
(4.Shipping)
ITEM No. DESCRIPTION ACCORDING TO
4,1 Marking Control & Release Note
Check of Closed Flange Opening and Transport Lockings. Filling with 0.03 MPa Nitrogen. Make sure spare part conform with the packing list.
DRAWING
CUSTOMER SPEC.
4,2 Loading Inspection EMP Spec.
4,3 Shipping Release EMP Spec.

 

Prefabricated Piping Spools

(1.General)
ITEM No. DESCRIPTION ACCORDING TO
1,1 Drawing Review and Approval Construction Drawings
1,2 ITP Approval This Specification
1,3 Welding Plan ASME B31.3 Para 328 + ASME IX, equiv. EN
1,4 WPS & WPQR Review ASME B31.3 Para 328 + ASME IX, equiv. EN
1,5 Welder Qualification Certificates (WQR, WOQR) ASME B31.3 Para 328 + ASME IX, equiv. EN
1,6 NDE Procedures (VT, RT, MT or PT) (Review of all radiographs films) Review ASME B31.3 Para 343 + ASME BPVC Sec V Art 1, equiv. EN
1,7 NDE Personnel Qualification Review ASNT SNT-TC-1A, level II Alternative: ISO 9712
1,8 Surface Finishing & Painting Procedure EMP Spec.
1,9 Base & Welding Material Mill Test Reports (incl.heat treatment records,etc.) EN 10204 3.1.
1,10 Check Incoming Material and Mill Marks Record Manuf. Procedure
(2.Construction)
ITEM No. DESCRIPTION ACCORDING TO
2,1 Visual and dimensional checks before assembling Construction Drawings
2,2 Cutting, Markings Transfer and Traceability Construction Drawings
2,3 Preparation of Weld Edges ASME B31.3 para. 328.4 – According to the approved WPS.
2,4 Matching of Weld Edges ASME B31.3 para. 328.4 – According to the approved WPS.
2,5 Preheating ASME B31.3 para. 330 – According to the approved WPS.
2,6 Welding ASME B31.3 para. 328 – According to the approved WPS.
2,7 Removal of Tack Welds Approved WPS
2,8 Drawing code and job number marking on each line Construction Drawings
2,9 PT on 100% Removed Tack Welds ASME V article 6 or EN equiv.
2,10 Welding map, Welder identification and weld number marking on each weld Construction Drawings and Welding Map
2,11 VT on 100% on complete welding ASME B31.3 para. 344.2 + ASME V Article 9 or EN equiv.
2,12 UT on 100% branch ASME V Article 4 or EN equiv.
2,13 PT on 100% fillet and socket welds ASME B31.3 para. 344.5 + ASME V Article 2 or EN equiv
2,14 RT on 100% circumferential butt welds ASME B31.3 Para 328 + ASME IX or EN equiv.
(3.Final Testing)
ITEM No. DESCRIPTION ACCORDING TO
3,1 Piping Internal Check Construction Drawings
3,2 Final Visual & Dimensional & Quantity Check of Prefabricated Spools Construction Drawings
3,3 Final Marking Check ASME B31.3 para. 328.4 – According to the approved WPS.
3,4 Hydraulic Test Not Applicable
3,5 Protective Coating & Painting Check EMP Spec.
3,6 Packaging Inspection Before the Delivery Manuf. Procedure
3,7 Manufacturer Data Book Release EMP Spec.
3,8 Check for Piping Readiness for Shipment / Ship Release EMP Spec.
3,9 Pre-shipment Inspection EMP Spec.

 

Steel Structures

(1.General)
ITEM No. DESCRIPTION ACCORDING TO
1,1 Design and engineering review EN 1090-2: EXC2;
EN 3834 -3
1,2 Materials certificates EN 10204 3.1
1,3 WPS, PQR and welder qualifications Std. Manufacturer
EN 15614; EN 287
1,4 NTD operator qualifications Std. Manufacturer
EN 9712
1,5 Visual Test (VT) on welds Std. Manufacturer
EN 17637; EN 5817 liv. C
1,6 Magnetic Test (MT) on welds EN 17638;
EN 23278
1,7 UT for welds with full penetration EN 17640;
EN 11666, EN 16810
1,8 UT for lamination of plates EN 10160 E1S1
1,9 Check of zinc protection EN 1090-2: EXC2
EN 1461
(2.Final Testing)
ITEM No. DESCRIPTION ACCORDING TO
2,1 Check of marking DWG
2,2 Visual and dimensional test P.O. and specifications
EN 1090-2: EXC2
2,3 Packing and marking check PO and specifications
2,4 Final check of documentation P.O. and specifications
Reg 305/2011/EC
2,5 Shipment Suitable packing for track
according to Employer packing spec.